M & R Aviation Sdn Bhd
|
Supply, Delivery, Install, Commission,
Training and Handing Over the complete Motorola
Wireless Communication System for the Tanjung
Pelepas Port, Johore, Malaysia
|
RM 4,600,000.00
|
1999 |
Fiberail Sdn Bhd
|
Provision
of Engineering Services for testing and commissioning
of Fiber
Optic Network along the R.O.W of KTMB
|
RM 350,000.00
|
2000 |
Time dot com
|
Outside Plant Civil Works for Pasir Gudang
Industrial Area Package 2
|
RM 360,744.40
|
2001 |
Time dot com
|
Building Access for City
Square, Johor Bahru
|
RM 40,895.40
|
2000 |
Time Wireless Sdn Bhd
|
The Design, Construction,
Supply, Installation, Testing and Commissioning,
Completion and Maintenance of Base Transceiver
Station BTS Including Site Acquisition and
Integration,
Throughout Malaysia
|
RM 609,816.85
|
2000 |
Time Wireless Sdn Bhd
|
The
Design, Construction, Supply, Installation, Testing
and Commissioning, Completion and Maintenance
of Base Transceiver Station BTS Including Site
Acquisition and Integration, Throughout Malaysia
|
RM 620,383.52
|
2000 |
Time Wireless Sdn Bhd/
Datapuri Sdn Bhd
|
The Design, Construction,
Supply, Installation, Testing and Commissioning,
Completion and Maintenance of Base Transceiver
Station BTS Including Site Acquisition and
Integration,
Throughout Malaysia
|
RM 1,554,270.49
|
2001 |
Telekom Malaysia Berhad
|
Perlakasanaan
Projek Rangkaian Tempatan TMB Secara Sistem Jadual
Kadar Harga 5th Contract - K 2369/01
|
RM 15,000,000.00
|
2001 - 2006
|
Guthrie Corridor Expressway
Sdn Bhd
|
The proposed construction
and completion of Guthrie Corridor Expressway
on design and build basis. Design and build for
supply, installation, testing and commissioning
of main ducting works
|
RM 1,742,918.90
|
2002 |
Guthrie Corridor Expressway
Sdn Bhd
|
The
supply, Delivery, Installation, Testing and Commissioning
of Fiber Optic Cable, Copper Cable and Power
Cable along Guthrie Corridor Expressway
|
RM 881,822.96
|
2004 |
Fiberail Sdn Bhd
|
The Installation of Second Fibre Optic Cable
Along the Railway Corridor of Keretapi Tanah
Melayu Berhad Between Kuala Lipis and Gua Musang
|
RM 2,998,170.24
|
2004 |
Rohas Euco Industries Bhd
|
Construction
and erection works of a 200ft heavy duty tower
inclusive of foundation and civil works at Guar
Perahu, Pahang
|
RM 41,899.54
|
2002 |
Rohas Euco Industries Bhd
|
Construction and erection
works of a 200ft heavy duty tower inclusive of
foundation and civil works at Kubang Semang,
Penang
|
RM 87,167.02
|
2002 |
Rohas Euco Industries Bhd
|
Construction
and erection works of a 200ft heavy duty tower
inclusive of foundation and civil works at Gopeng,
Perak
|
RM 94,927.10
|
2002 |
Rohas Euco Industries Bhd
|
Construction and erection
works of a 200ft heavy duty tower inclusive of
foundation and civil works at Vacant Land Sungai
Tiang, Pendang
|
RM 286,193.72
|
2003 |
Rohas Euco Industries Bhd
|
Construction
and erection works of a 200ft heavy duty tower
inclusive of foundation and civil works at Vacant
Land Alur Janggus, Kedah
|
RM 113,150.22
|
2003 |
Rohas Euco Industries Bhd
|
Construction and erection
works of a 200ft heavy duty tower inclusive of
foundation and civil works at Vacant Land Tanah
Merah, Kedah
|
RM 76,847.75
|
2003 |
Rohas Euco Industries Bhd
|
Construction
and erection works of a 200ft heavy duty tower
inclusive of foundation and civil works at Vacant
Land Simpang Lima, Perak
|
RM 126,587.58
|
2003 |
Rohas Euco Industries Bhd
|
Construction and erection
works of a 200ft heavy duty tower inclusive of
foundation and civil works at Kem Batu 10, Kuantan
|
RM 81,554.75
|
2004 |
Rohas Euco Industries Bhd
|
Construction
and erection works of a 200ft heavy duty tower
inclusive of foundation and civil works at Chini
Timur, Pahang
|
RM 109,745.00
|
2004 |
|
LIST OF MAJOR PROJECTS UNDERTAKEN BY THE COMPANY
|
CLIENT
|
CONTRACT
DESCRIPTION
|
CONTRACT
AMOUNT
|
DATE
|
JTM/Telekom
Malaysia
Berhad (TMB)
|
Overview Planning, Demand
Forecast,
Fundamental Planning, Detail Design and Supply,
Install, Testing and Commissioning of Local
Telecommunication Network by Turnkey System
|
RM 636,000,000.00
|
1983 - 1989 |
Time
Engineering/PERCON
|
Rehabilitation
of Civil Work for Kuala Lumpur -
Seremban Expressway
|
RM 3,200,000.00
|
Oct 91
- Dec 92 |
Time Engineering/PLUS
|
Supply, Installation and
Commissioning of
Telecommunication System using Optical Fiber
Cable along North-South Expressway
|
RM 80,000,000.00
|
Dec 91 - Oct 94 |
Petronas
Carigali Sdn Bhd
|
Provision
of Equipment and and Engineering
Services to Upgrade/replace the digital Microwave
Radio Link System in Duyung
|
RM 2,200,000.00
|
Jun 95
- Dec 95 |
AEG Westinghouse (M)
Sdn Bhd
|
Kuala Lumpur Light Rail
Transit System (LRT)
Design, Supply, Install and Commissioning of
Telecommunication System
|
RM 2,537,000.00
|
1994 - 1996 |
ABB
Daimler Benz (Projects)
Sdn Bhd
|
Kuala
Lumpur Light Rail Transit System (LRT)
Design, Supply, Install and Commissioning of
Telecommunication System, System 1 Phase 2
|
RM 3,998,000.00
|
1997 -
1998 |
Bombadier (M) Sdn Bhd
|
Kuala Lumpur Light Rail
Transit System (LRT)
Install and Commissioning of Telecommunication
System, System 2
|
RM 9,083,000.00
|
1997 - 1999 |
Telekom
Malaysia Berhad
|
Perlaksanaan
Project Rangkaian Tempatan TMB
Secara Sistem Jadual Kadar Harga
1st Contract - K 1098/91
2nd Contract - K 1031/93
3rd Contract - K 1028/93
4th Contract - K 1066/95
|
RM 15,000,000.00
RM 15,000,000.00
RM 50,000,000.00
RM 50,000,000.00
|
Jan 90
- Dec 91
Jan 92 - Dec 92
July 93 - Mar 95
Apr 95 - Apr 01
|
Time Automation &
Management Services/
Teknik Naga Sdn Bhd
|
Turnkey Contract/Concept
- Design, Supply,
Testing and Commissioning of Local
Telecommunication Network For Segamat -
Gambang Link
|
RM 14,454,000.00
|
Sep 95 - Dec 95 |
Time
Salam/Time Automation
&
Management Services
(TAMS)
|
The Construction
of Manholes. Laying of Ducts
and Other and Other Related Works Including
Installation of Fiber Optic Cables for Time
Telecommunications Sdn Bhd
- Petaling Jaya
- Melaka
- Johor Bharu
|
RM
1,700,000.00
RM 1,200,000.00
RM 600,000.00
|
Jun-95
Sep-95
Sep-95
|
Time Automation &
Management Services/
Teknik Naga Sdn Bhd
|
Turnkey Contract Concept
- Design, Supply,
Testing and Commissioning of Local
Telecommunication Network For Kuantan -
Dungun
|
RM 15,500,000.00
|
Sept - Dec '95 |
Time
Automation &
Management Services/
Kembang Maju Sdn Bhd
|
Turnkey
Contract Concept - Design, Supply,
Testing and Commissioning of Local Telecommunication Network For K. Terengganu
- Kota Bharu
|
RM
19,260,000.00
|
Nov
'95 - Feb '96
|
Celcom Transmission (M)
Sdn Bhd
|
Planning, Design and Project
Management Services of Civil Civil Infrastructure
Fiber Optic Metro Network Klang Valley Link - Johor
Metro
|
RM 4,040,535.55
|
Sep-95
|
Fiberail
(M) Sdn Bhd
|
Provision
of Engineering Services - for
testing and commissioning of Fiber Optic
Network for
- Gemas - Tampin
- Sedenak - Kluang
- Rawang - Tg. Malim
- Paloh - Kluang
- Kluang - Layang-Layang
- Kampas - Pasir Gudang
- Bukit Mertajam - Taiping
- KT 007/96 North - South
- KT 015/96 - Northern |
RM
1,495,000.00
RM 400,000.00
RM 600,000.00
RM 800,000.00
RM 800,000.00
RM 700,000.00
RM 1,800,000.00
RM 1,000,000.00
RM 1,500,000.00
|
Aug
95 - Oct 95
Sep 95 - Nov 95
Dec 95 - Feb 96
Mar 96 - May 96
Mar 96 - May 96
Mar 96 - May 96
May 96 - Sep 96
Apr 96-Oct 96
June 96-Dec 96
|
Consortium
Bukaka - Telekomindo
Indonesia
|
Supply, Install and Commissioning
of Outside Plant Network for P. T. Telekom Indonesia
in The Island of Sulawasi
|
RM 10,000,000.00
|
Mar-96
|
Sumitomo
Corp
Sri Lanka
|
Cable
Jointing and Commissioning of Outside
Plant Network for Sri Lanka Telekom
|
RM
1,200,000.00
|
Nov-95
|
Binariang Sdn Bhd
|
Supply of Materials, Delivery
to Site, Installation,
Testing and Commissioning of Duct Infrastructure Network for Scheme Subang
|
RM 5,583,069.33
|
Oct 95
- Oct 96 |
Teknolite
Sdn Bhd
|
Engineering,
Procurement, Construction and
Commissioning of Fiber Optic Transmission
Network of PACKAGE II & III for Celcom Petro
Network (M) Sdn Bhd
|
RM
12,890,000.00
|
Dec
96 - Jun 97 |
Time Automation and Mgt
Services Sdn Bhd
|
PLUS maintenance of Data
Network and Telecommunication Equipment
|
RM 6,400,000.00
|
Jan 1996
-
Dec 1997
|
Royal
Malaysian Navy
|
Supply,
delivery and installation of SPT PA, sound
powered telephone and talkback system for Sabah
class x 28 ships minehunters and landing craft
|
RM
2,400,000.00
|
1979
- 1984
|
Royal Malaysian Navy
|
Supply, delivery, installation
testing and
commissioning of SPT PA and intercoms for RMN
vessels
|
RM 1,800,000.00 |
1994
- 1995 |
Petronas
Carigali Dulang A&B
|
Supply,
delivery, installation, testing and commissioning
of PA and alarm system
|
RM
1,500,000.0
|
1990 |
Petronas Carigali Sdn
Bhd
|
Contract No : PRO 194-050-063
Provision of Equipment and Engineering Services
and Engineering Services to Upgrade/Replace Microwave
Radiolink System at Duyong
|
RM 2,300,000.00
|
May 95
- 1997
|
PT
Tripatra Constructers
Indonesia
|
Engineering,
Procurement, Construction and Commissioning of
Fiber Optic Transmission Network for PT Excellcom
Indo along Railway track in Java Island
|
RM
42,000,000.00
|
Nov
96 -
Apr-98
|
M & R Aviation Sdn
Bhd
|
Supply, Delivery, Install,
Commission, Training and
Handing Over the complete Motorola Wireless
Communication System for the Tanjung Pelepas
Port, Johore, Malaysia
|
RM 4,600,000.00
|
May 99
-
Dec-99
|
Time
Wireless Sdn Bhd/
Datapuri Sdn Bhd |
The Design,
Construction, Supply, Installation,
Testing and Commissioning, Completion and
Maintenance of Base Transceiver Station BTS
Including Site Acquisition and Integration,
Throughout Malaysia
|
RM
1,554,270.49
|
2001
- 2003
|
Telekom Malaysia Berhad
|
Perlakasanaan Projek Rangkaian
Tempatan TMB Secara Sistem Jadual Kadar Harga 5th
Contract - K 2369/01
|
RM 15,000,000.00
|
Aug 2001
-
Aug 2006
|
Guthrie
Corridor Expressway
Sdn Bhd
|
The proposed
construction and completion of
Guthrie Corridor Expressway on design and build
basis. Design and build for supply, installation,
testing and commissioning of main ducting
works
|
RM
1,742,918.90
|
Aug
2002 -
Mar 2005
|
Fiberail Sdn Bhd
|
The Installation of Second
Fibre Optic Cable Along
the Railway Corridor of Keretapi Tanah Melayu
Berhad Between Kuala Lipis and Gua Musang
|
RM 2,998,170.24
|
2004 |
|
| |
|
|
| |
|
|
|
|
|
|